SUMMER 2014 IMPROVEMENT PROJECTS

#11 Tee Box Renovation 9/22 (Top Dressing)

Driving Range Tee Renovation 9/22 (Top Dressing)

#11 Tee Box Renovation 8/27/14

#11 Tee Box Renovation 8/21/14

#8 Tee Box Renovation 8/15/14

Driving Range Tee Renovation 8/13/14

JUNE THROUGH AUGUST
* Re-grass driving range target greens with TifGrand Bermuda
* Laser level and re-grass driving range tee with Celebration Turf
* Laser level and re-grass short game area tee with Celebration Turf
* Laser level and re-grass (14) various tee boxes with Celebration Turf
* Renovating Golf Course bathrooms on #8 and #15.
* Tree work

Lightning Strike 7/26/14 #9 Cypress Tree

Lightning Strike
7/26/14
#9 Cypress Tree

Tee Complex Renovation #11

Tee Complex Renovation #11

About these ads
Image | This entry was posted in Uncategorized. Bookmark the permalink.

2 Responses to SUMMER 2014 IMPROVEMENT PROJECTS

  1. Ross & Nancy Kitt says:

    Rob, since we’re away for the summer it is quite interesting to see your updates on the progress of the green renovations, particularly the detail the videos provide. Good job, and thanks.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s